Access the Full Project by Clicking here!
Bidjugde
JOB
Water Distribution Fire Protection System Enhancements
BID DATE
05/4/21 - 2:00
AGENCY
Longview
ESTIMATE
$1,100,000
SCOPE
Work under this contract includes: SCH 1 – Hunt to Hope: 8” C900 PVC water line connecting existing 6” water line to existing 16” transmission line. SCH 2 – Greenridge Area: 8” C900 PVC water line connecting 6” water line on Greenridge to 20-in transmission line west of Paul Boorman Trail; 8” water line connecting 6” water line on Ruthlynn to 6” water line on Cynthia; 8” water line connecting 6” water line on Hampshire to 6” water line on Richfield. SCH 3 – Edna Street Area: 8” C900 PVC water line connecting 6” water line on Edna with 6” water line on John; connecting 6” water line on Webster; connecting 6” water line on Velma. 8” C900 PVC water line connecting 6” water line on Caldwell with 6” water line on Andrews with 2” water line on Fowler with 6” water line on Berry. 8” C900 PVC water line connecting 2” water line on John with 6” water line on Webster. 8” C900 PVC water line connecting 6” water line on Fuller with 4” water line on Berry. SCH 4 – Pine Street Area: 8” C900 PVC connecting water lines on Ninth Street, Tenth Street, Lake Street, Dale Street, Parkview, and Hughley Drive. https://www.civcastusa.com/project/607107e41de1b51ce37a9e62/summary John@jcrengineers.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT