2021 Annual Resurfacing Phase 1 Flower Circle Reconstruction
BID DATE
05/4/21 - 2:00
AGENCY
Marina
ESTIMATE
n/a
SCOPE
Flower Circle reconstruction is phase 1 of the City’s Annual Street Project. Flower Circle a residential street of approximately 800’ long and 31’ wide. The work includes, but not limited to; Installation of ADA compliant curb ramps, conform curb, gutter, and sidewalk, pulverizing existing asphalt concrete pavement and full depth reclamation (cement), roadway excavation and compaction, installation of hot mix asphalt and pavement making and striping and associated miscellaneous work for a complete road reconstruction in accordance with Contract document. egomez@cityofmarina.org