Access the Full Project by Clicking here!
Bidjugde
JOB
Site Restoration on US191 MP243
BID DATE
05/20/14 - 3:00
AGENCY
ADOT
ESTIMATE
$50,000
SCOPE
Site Restoration on US191, MP243 within the Globe District, in accordance with these specifications and the provisions contained in this Invitation for Bid (IFB). The Contractor shall be responsible for removal of access road and sediment from the work area, removal and sorting of large 8‐24” diameter rock, re‐grading, scarification, hydro‐seeding, and mulching. Hauling and placing large rock, embankment material, and waste material shall be included as part of the cost of the contract items. Other incidental work such as moving slash or downed trees may be required to access the work site. Drainage Excavation and Sediment removal material is to be hauled approximately three (3) miles to Isabell material pit and dumped at the direction of the Project Manager or his/her representative. Embankment removal material is to be hauled approximately ten (10) miles to Bardman material pit and dumped at the direction of Project Manager or his/her representative. Rock and RipRap material are to be removed and replaced on‐site along the existing highway embankment as erosion protection at the direction of the Project Manager or his/her representative. Excess rock material shall be hauled to the Bardman material pit and dumped at the discretion of the Project Manager or his/her representative. Amir Sakhi Procurement Officer Phone: (602) 712‐8584 Email: asakhi@azdot.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT