Access the Full Project by Clicking here!
Bidjugde
JOB
Juan Bautista De Anza Multi Use Trail Phase 1
BID DATE
05/11/21 - 2:00
AGENCY
Moreno Valley
ESTIMATE
$1,300,000
SCOPE
This project consists of constructing a 6’ to 10’ wide AC or PCC as an alternate bid, multi-use trail with 5’ wide decomposed granite as pedestrian path as shown on plans, starting at Iris Avenue, approximately 400 feet east of Perris Boulevard, extending southeasterly to the Krameria Avenue and Kitching Street intersection and to El Potrero Park by way of Camino Bellagio and Via Pamplona. The multi-use trail consists of mixed or shared bike path and pedestrian walkway. It features a pedestrian hybrid beacon otherwise known as HAWK at Iris Avenue. A pedestrian “scramble” signalized crossing will be installed at Krameria Avenue/Kitching Street, as well as segmental retaining walls and curbs. techinfo-capproj@moval.org https://pbsystem.planetbids.com/portal/24660/bo/bo-detail/81226

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT