Access the Full Project by Clicking here!
Bidjugde
JOB
San Francisco Transition Structure - Marine Barrier
BID DATE
10/28/14 - 2:00
AGENCY
BART
ESTIMATE
$50,000,000
SCOPE
UPDATE: INCORRECT RESULTS FOR THIS PROJECT. Provide construction of a marine barrier consisting of a system of welded steel girders placed in a horizontal attitude and stacked vertically with bolted connecting member that shall be constructed on all four sides of the BART San Francisco Transition Structure (SFTS) beneath the level of the ferry plaza and extended above and below the waterline. gleong1@bart.gov Gary.Leong@BART.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT