Access the Full Project by Clicking here!
Bidjugde
JOB
T-4 3 MG Water Tank and Booster Pump Station
BID DATE
05/13/14 - 3:00 LIVE!
AGENCY
Fresno
ESTIMATE
$10,000,000
SCOPE
The scope of work includes: the furnishing of all labor, materials, tools, machinery, permits, certificates, bonds, insurance, supplies, and services for the construction of a 3-MG AWWA D110, Type 1, prestressed concrete potable water storage tank and booster pumps station complete with all connections to and from the distribution main in H Street; clearing and grubbing, grading, curb, gutter, paving, fencing, sidewalk, sewer, on-site piping and improvements for CMU booster pumps station, instrumentation, programming and SCADA control systems, office, laboratory, restroom, electrical room, chlorination equipment and future on-site Granular Activated Carbon (GAC) vessels, off-site street improvements, landscape and irrigation pumps, emergency power diesel generator; and site security system. Mike Brown Mike.Brown@Fresno.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT