JOB
Fresno Street Pavement Overlay
BID DATE
05/6/14 - 3:00 LIVE!
AGENCY
Fresno
ESTIMATE
$1,000,000
SCOPE
The scope of work includes asphalt concrete grinding and overlaying along N. Fresno Street from E. Gettysburg Ave. to E. Sierra Ave. The work will consist of a 0.2’ deep perimeter conform grind and then applying a 0.2’ thick asphalt concrete overlay. Major intersections will receive a full 0.2’ deep grind thick and asphalt concrete overlay. In addition, we plan to replace all non-conforming wheelchair ramps and traffic signal pedestrian push button, replace all signal loops impacted, and restripe the pavement within the project boundary. Jean Runnels Jean.Thomas-Runnels@Fresno.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT