Access the Full Project by Clicking here!
Bidjugde
JOB
Caughfield Phase Twelve Thirteen Paving Drainage Water Wastewater Improvements
BID DATE
04/16/21 - 10:00
AGENCY
Larkspur
ESTIMATE
n/a
SCOPE
The work shall consist of the following: Stormwater Reinforced Concrete Pipe Including Approximately 18”- 48” Pipe, Headwalls and Appurtenances; Water Piping Including 8”-12" PVC Mains and Appurtenances; Gravity Wastewater Piping consisting of 8” PVC Pipe and Appurtenances; Pressure (Force main) Piping consisting of 4” PVC Pipe and appurtenances; Excavation, Embankment, and Paving; Sedimentation & Erosion Control; Water Quality Improvements Including Two (2) Batch Detention Ponds, Vegetated Filter Strips, and Various Other Site Improvements. https://www.civcastusa.com/project/605b75e1df2a1b2c27d439f3/summary charris@bgeinc.com
PREBID
4/7/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT