Access the Full Project by Clicking here!
Bidjugde
JOB
West Bank Interceptor Reroute Improvements
BID DATE
05/13/21 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The major work shall generally consist of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 1,700 linear feet of 54-inch Hobas ASTM D3262 gravity wastewater line, approximately 400 linear feet of 8-inch, 15-inch, 36-inch, & 48-inch PVC gravity wastewater line, 13 new manholes of various size and material, surface replacement, temporary by-pass system, and all necessary components as shown on the project drawings and as specified herein. https://www.civcastusa.com/project/6061f95742b0d1e1ed03503b/summary victorv@wacotx.gov
PREBID
4/8/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT