Saratoga Springs Lake Mountain Zone 2 South Pond Losee Canyon Debris
BID DATE
04/13/21 - 12:00
AGENCY
Saratoga Springs
ESTIMATE
n/a
SCOPE
The project is described in general as: SCHEDULE A: The construction of a concrete-lined 10 AC-FT irrigation pond and pressurized irrigation pipeline. Construction includes associated piping, overflow channel, site drainage channel, inlet and outlet vaults, collection basin, and drainage piping. This project will be constructed to the City of Saratoga Springs standards and will be incorporated into the City’s pressurized irrigation system. SCHEDULE B: The construction of a 19.3 AC-FT earth-fill debris basin, spillway, outlet structure, and outfall storm drain pipeline. Construction includes earthwork (cut/fill), embankment construction, cast-in place concrete, metalwork, storm drain piping, riprap placement, and incidental landscaping and reseeding. This project will be constructed to FEMA and the City of Saratoga Springs standards and will be incorporated into the City’s storm drain system. Amber LeFors +1 801-766-6506 alefors@saratogaspringscity.com https://solutions.sciquest.com/apps/Router/SourcingResponseSummary?EventId=961972&SupplierId=17322236&OrgName=50031095&tmstmp=1616945750298
UPDATES