Access the Full Project by Clicking here!
Bidjugde
JOB
Harvest Green Lift Station No 3 Expansion
BID DATE
04/8/21 - 10:00
AGENCY
Grand Parkway
ESTIMATE
n/a
SCOPE
The work consists of providing the necessary labor, materials, equipment, and supervision to construct Harvest Green Lift Station No. 3 Expansion, including but not limited to mobilization, bonds and insurance; demolition of two (2) submersible pumps, riser piping and valves; installation of three (3) submersible pumps and accessories, new riser piping, valves, and fittings; protective coatings; site work; bypass pumping; modifications to the existing electrical control panel; and all else shown on the construction drawings and detailed in the specifications for a fully functioning lift station. https://www.civcastusa.com/project/6054b64553b634d732a72e47/summary cryoung@jonescarter.com
PREBID
3/25/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT