Access the Full Project by Clicking here!
Bidjugde
JOB
Addison Kellway Lift Station By Pass
BID DATE
04/20/21 - 2:00
AGENCY
Addison
ESTIMATE
n/a
SCOPE
The project consists of the installation of a third vertical close-coupled solids-handling pump and associated valves, fittings, pump pedestal, and pipe supports at Kellway Lift Station. Additionally, the project will install a new manhole with connections to the lift station and existing manhole, new wall cores and valving from the lift station to the manhole, a bypass pumping connection, and common suction header between the three pumps. Bypass pumping during construction will be required. https://www.civcastusa.com/project/60523ea21fb8c2f550b2c9dc/summary caturner@garverusa.com
PREBID
4/6/2021 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT