(CMAR) Pima Mine Rd Santa Cruz River Bridge
BID DATE
06/30/14 - 11:00
AGENCY
Sahuarita
ESTIMATE
$5,100,000
SCOPE
AWARD JUNE 2014- The project consists of constructing a new four-lane, two-span bridge at the Pima Mine Road crossing of the Santa Cruz River – that will replace the existing structure. Waterlines (and potentially other utility crossings) will be attached to the new bridge. Approximately 2200-feet of new roadway will be constructed to transition to/from the existing two-lane Pima Mine Road as it approaches the new bridge configuration. There will be (2) new 36” diameter waterlines constructed as part of the bridge project. Both waterlines will be designed and constructed to meet applicable Central Arizona Water Conservation District (CAWCD) standard specifications and codes. The current design plans are at an approximate 60% design level and the Town anticipates the initial construction period to begin in early 2015. Joel T. Harris (520) 344-7100 jtharris@sahuaritaaz.gov 375 W. Sahuarita Center Way Sahuarita, AZ 85629

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT