JOB
Santee Lakes Storm Drain Crossing
BID DATE
03/31/21 - 10:00
AGENCY
Santee
ESTIMATE
$2,100,000
SCOPE
Work to be done includes the furnishing of all labor, materials and equipment necessary for the removal of dual 72” corrugated metal pipe (CMP) storm drains with a reinforced concrete box culvert including, excavation, shoring, reinforced concrete box, storm drain structures, wing walls, rip rap, concrete sidewalks, chain link fencing, masonry walls, asphalt concrete paving, striping, landscape planting, irrigation, storm drain bypassing, dewatering, and all related and necessary work as defined in the contract documents https://www.cityofsanteeca.gov/Home/Components/RFP/RFP/1147/1713