Access the Full Project by Clicking here!
Bidjugde
JOB
Tracy WWTP Phase 2B Expansion
BID DATE
04/8/21 - 2:00
AGENCY
Tracy
ESTIMATE
n/a
SCOPE
https://qap.questcdn.com/qap/projects/prj_browse/ipp_browse_grid.html?group=4201841&provider=4201841 The Project is more specifically defined in the Plans and Specifications, but generally includes Tracy WWTP Phase 2B Expansion Project located at Tracy WWTP. This project generally includes but not limited to improvements to the existing bar screens, circular primary clarifier, large diameter pipes, digester, digester support facility, electrical building, skid-mounted centrifuge, conveyance system, pre-fabricated metal structures, reinforced concrete slab on grade, reinforced concrete slabs, staircases, chemical pumping package system, sumps, electrical, duct bank, instrumentation and controls, underground and above ground piping, pipe supports, sump pumps, storm drain inlet, sidewalks, doors, 12KV electrical system, junction box, transformers, motor control center, switchboards, deep excavations, dewatering, Sheeting, Shoring and Bracing, demolition of existing facilities, bypass pumping, gates, valves, electrical, pneumatic and manual operators, slide gates, flow control valves, flow meters, pipe supports, and other mechanical, electrical, instrumentation, cathodic protection, coating and structural work associated with the expansion project. https://www.ci.tracy.ca.us/?navid=12024
UPDATES