Access the Full Project by Clicking here!
Bidjugde
JOB
Sunflower Red Hill Interceptor Repairs
BID DATE
04/15/21 - 11:00
AGENCY
Orange County SD
ESTIMATE
$3,250,000
SCOPE
The project will repair PVC liner failures within a 6,000 foot section of the 54” - 78” RCP Sunflower and Red Hill Interceptors. Included in this section are three siphons that require similar repair. The Project will require daily traffic control set ups/tear downs, man-entry of active sewers, temporary diversions, and bypass pumping, all to be performed at night, during low flows. The Project will also pour concrete to form a flat bottom inside the pipe to artificially keep low flows above the area of exposed concrete where the 270-degree PVC lining stops. https://pbsystem.planetbids.com/portal/14058/bo/bo-detail/80939 Clarice Marcin construction@ocsd.com
PREBID
3/18/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT