Access the Full Project by Clicking here!
Bidjugde
JOB
Southwest Lift Station Construction
BID DATE
04/14/21 - 2:00
AGENCY
Provo
ESTIMATE
n/a
SCOPE
Construction of the Provo City Southwest Lift Station generally includes the excavation, dewatering, necessary shoring, grading, yard piping, wet well and dry pit concrete structures; building construction including concrete, CMU, plumbing, electrical and HVAC, piping and standby generator; dry-pit submersible pump station, including suction and discharge piping and instrumentation; and site improvements including pavement, driveway, drainage improvements, and perimeter fencing with access gate. Splitter box, pump station dry pit, and wet wells will be constructed of cast in place concrete. Electrical building will be constructed of CMU and will be the only above-ground structure. Construction will include installing three (3) pumps in this phase while allowing for the future installation of one additional pump. The wet wells are trench-style and designed for self-cleaning operations. An outdoor diesel standby generator with base-mounted diesel fuel storage tank will be included. David Torgersen +801 (852) 6701 dtorgersen@provo.org
UPDATES