Access the Full Project by Clicking here!
Bidjugde
JOB
Broadway Drainage Improvements Main Street
BID DATE
04/9/14 - 2:00
AGENCY
Chula Vista
ESTIMATE
$900,000
SCOPE
The scope of work consists of the installation of drainage improvements along Broadway from Main Street to south of the City limits. This includes the installation of storm drain pipes, clean-outs, transition storm drain structures, curb inlets, headwall and rip-rap energy dissipator. Also included is trenching, excavation and grading, removal and disposal of existing improvements, asphalt concrete pavement, saw cutting, pavement restriping and markings, trafific control, protection and restoration of existing improvements and other miscellaneous work. Luis Labrada, 619-476-2321 llabrada@chulavistaca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT