South Chapman Gateway - 19th Street Alley - CDBG
BID DATE
04/22/14 - 4:00
AGENCY
Chico
ESTIMATE
$185,000
SCOPE
The work, in general, to be done under this contract consists of roadway excavation, placing new PCC curb, gutter, sidewalk, driveways, and alley conforms at designated areas, constructing a 6" thick concrete alley, placing hot mix asphalt, relocating existing fences, installing sanitary sewer pipe and laterals, storm drain pipe, drainage inlets and manholes, and installing street lights, all in conformance with the attached contract specification and the details as shown on the contract plans Bob Greenlaw, telephone (530) 879-6900, Fax (530) 895- 4899.