Acequia Madre Pipeline (REBID)
BID DATE
04/2/21 - 10:00
AGENCY
San Mateo - NM
ESTIMATE
n/a
SCOPE
Adame Construction - $380,346 The project consists of installing 2,623 feet of 12 inch diameter plastic irrigation pipe (PIP), tie-in to an existing 12” HDPE pipe through concrete junction box, installation of two pipe diversions off the mainline, and a concrete junction box with control gates to distribute irrigation water. One field turnout will also be installed at the end of line headwall constructed. https://www.wilsonco.com/plan-room