Access the Full Project by Clicking here!
Bidjugde
JOB
Upper Leon Creek Government Canyon Regional RSWF
BID DATE
04/13/21 - 2:00
AGENCY
San Antonio
ESTIMATE
$7,410,378
SCOPE
Scope Construction of drainage channel improvements include: channel grading 150 ft. upstream of Culebra Road Bridge to 120 ft. downstream of Culebra Road Bridge and 150 ft. upstream of Timber Path Bridge to 1050 ft. downstream of Timber Path Bridge, armoring improvements at Culebra Road Bridge and Timber Path Bridge, an earthen pilot channel to convey water flow, concrete vertical retaining walls and rip-rap to stabilize side slopes downstream of Timber Path. The Culebra Creek Hike and Bike Trail (Cathedra Rock Park to Grissom Rd) includes a concrete, multi-use trail approximately 1.25 miles long and 10 feet wide. The project also includes trail signage, a drainage culvert, and a Low Impact Development (LID) parking/trailhead which includes lighting, a drinking fountain, a restroom enclosure, an emergency call box, minor landscaping, and other minor trailhead amenities. https://www.civcastusa.com/project/603cd218bf6aafad83ed79d6/summary lona.carter@sanantonio.gov
UPDATES