Access the Full Project by Clicking here!
Bidjugde
JOB
807 Lone Star Drive Pond Rehabilitation E Whitestone Storm Drain Maintenance
BID DATE
03/17/21 - 2:00
AGENCY
Cedar Park
ESTIMATE
$145,800
SCOPE
807 Lone Star Drive Pond Rehabilitation and E. Whitestone Blvd (RM 1431) Storm Drain Maintenance Project generally includes re-grading, fence installation, and the installment of concrete riprap at an existing detention pond located adjacent to the intersection of E. Whitestone Blvd (RM 1431) and Royal Ln. The other portion of the project occurs near the intersection of RM 1431 and US Highway 183. This portion generally includes the installation of new 18-inch RCP storm drain, requiring the sawcut and restoration of a small portion of concrete riprap. https://www.civcastusa.com/project/603d5597eef40279dd7ec49f/summary marisa.mcknight@cedarparktexas.gov
PREBID
3/9/2021 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT