Access the Full Project by Clicking here!
Bidjugde
JOB
CA BLM 2020 San Vicente Bridge
BID DATE
04/2/21 - 2:00
AGENCY
Department Transportation
ESTIMATE
n/a
SCOPE
This project includes the replacement of a single lane, 29-foot long single span steel girder bridge (Bridge #1) with a 49-foot long single span prefabricated steel girder bridge with steel decking and aggregate fill supported on spread footing foundations. The project also includes removal of a second out of service bridge (Bridge #2) which is approximately one-mile north of Bridge #1 on San Vicente Road. Bridge #2 consists of a 40-foot long single span structure with a timber deck on a steel railcar superstructure with two steel girders. The condition of the Bridge #2 has deteriorated to such an extent that the structure has been closed. Both bridges span San Vicente Creek. Access to the project sites is along San Vicente Road, a single lane, gravel road. https://beta.sam.gov/opp/fbabe5a9588e47e3b5820320ec812326/view?keywords=&sort=-modifiedDate&index=opp&is_active=true&page=2&inactive_filter_values=false¬ice_type=o&opp_publish_date_filter_model=%7B%22timeSpan%22:%227%22%7D&date_filter_index=0&pop_state=CA Sheri Walsh cflacquisitions@dot.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT