Via Verdi Slope Stabilization
BID DATE
04/13/21 - 2:00
AGENCY
Richmond
ESTIMATE
$6,434,120
SCOPE
In general, the work to be performed under these specifications consists of reconstruction of a portion of Via Verdi damaged by the landslide and the construction of a 350-foot-long reinforced concrete box culvert (inside dimensions: 24 feet wide, 19 feet high) in San Pablo Creek to buttress the landslide mass. Work shall include, but is not limited to, clearing and grubbing, temporary diversion/dewatering of the San Pablo creek channel (on-line construction), demolition of the existing concrete headwall, sidewalks, curb and gutter and other concrete improvements, on-site crushing of demolished concrete for re-use as aggregate in the FDR road construction process, connection to existing concrete culvert, reinforced concrete headwall, and 23 +/- degree reinforced culvert bend, concrete box culvert (span 24’; rise 19’), backfill as required, temporary utility relocation, road reconstruction (FDR), underground utility reconstruction, coordination with all applicable utility companies, drainage inlets, storm drain pipes, curb and gutter, sidewalk, curb ramps, street lights and electrical connection, fencing, signing, striping, restoration and grading of a portion of the adjacent cemetery property impacted by the project, temporary and permanent erosion control measures, creek bank stabilization measures, revegetation and planting, and related work that is required by the Project Plans, the Special Provisions, Standard Specifications, or that arise during construction. https://pbsystem.planetbids.com/portal/14590/bo/bo-detail/80855#bidInformation Tawfic Halaby tawfic_halaby@ci.richmond.ca.us
UPDATES