Access the Full Project by Clicking here!
Bidjugde
JOB
Magrino Industrial Park Unit No 3 Base Phase Roadway Improvements
BID DATE
03/15/21 - 3:00
AGENCY
San Luis
ESTIMATE
n/a
SCOPE
The work consists of, but is not limited to, paving approximately 1,500 lineal feet of full roadway width and related work as a part of the "Base Phase" of the Magrino Industrial Park Unit No. 3 Subdivision and ancillary work. Said related work also includes adjusting valves and manholes to grade as well as the installation of a box culvert and driveway approach at the 242 Lateral Canal which is controlled by the US Bureau of reclamation. Work will be performed per specifications of the Contract Documents and Project Plans. The project shall be completed within 90 calendar days from the date of Notice to Proceed. The work consists of, but is not limited to, paving approximately 1,500 lineal feet of full roadway width and related work as a part of the "Base Phase" of the Magrino Industrial Park Unit No. 3 Subdivision and ancillary work. Said related work also includes adjusting valves and manholes to grade as well as the installation of a box culvert and driveway approach at the 242 Lateral Canal which is controlled by the US Bureau of reclamation. Work will be performed per specifications of the Contract Documents and Project Plans. kburge@core-e-g.com
PREBID
3/8/2021 3:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT