Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drainage Facilities 6 4617 Acres
BID DATE
03/9/21 - 3:00
AGENCY
Kingsbridge MUD
ESTIMATE
n/a
SCOPE
Project consists of approx. 1,402 linear feet of 36" RCP storm sewer and 96 linear feet of 42" Polypropylene storm outfall to West Keegans Bayou, reinforced concrete slope pavement, 10 precast concrete storm manholes, approx. 140 linear feet of 36" RCP bore & jack, temporary fencing along existing tree & shrub sales, and haul of excess excavated material to a cleared 2.8-acre site within the project site for fill and compaction (approx. 1-foot depth). Includes finished grading, hydromulching of disturbed areas and easements, stormwater pollution prevention measures. https://www.civcastusa.com/project/603c3a388a7fa6868adfd219/summary david.miller@miller-and-associates.com
PREBID
3/2/2021 11:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT