Route 1 9 Intersection Improvement
BID DATE
04/1/21 - 2:00
AGENCY
Santa Cruz - CA
ESTIMATE
$5,000,000
SCOPE
The work to be done consists of widening the existing intersection to accommodate additional vehicle turn lanes, bicycle lanes, and shoulders. Reconstruction of the median on the southern leg of Route 1, minor widening and restriping of NB Route 1 would be required to accommodate the additional lane. NB Route 9 would be widened to the east to accommodate the additional left-turn movement from SB Route 1. SB Route 9 would be reconfigured to accommodate two through lanes and shoulder from the Route 1/Route 9 intersection to Fern Street. A raised median would be constructed from Route 1/Route 9 intersection to Fern Street. SB Route 9 would be reconfigured from Fern Street to Encinal Street to accommodate one left-turn lane, a left/through lane, a bike lane, a right turn lane, and shoulder. NB River Street would be reconfigured to accommodate a left/through lane, one through lane, bike lane, two right-turn lanes, and sidewalk. The roadway would be widened to the east to accommodate the reconfiguration. SB Route 9 would be widened to provide an additional through lane to SB River Street. SB Route 9 would be reconfigured to accommodate two left turn lanes, one left/through lane, one through lane, bike lane, a right-turn lane, shoulder, and sidewalk. Work includes HMA overlay and cross slope correction, traffic signal modification, drainage modifications, City of Santa Cruz water line modifications, City of Santa Cruz sanitary sewer manhole adjustments, retaining walls, sound wall reconstruction and planting.
UPDATES