Access the Full Project by Clicking here!
Bidjugde
JOB
FY 2020 21 Street Improvement
BID DATE
03/18/21 - 2:00
AGENCY
Chino Hills
ESTIMATE
$1,080,000
SCOPE
The work comprises, but is not limited to: Mobilization; Traffic Control; selective 2-inch grind and 2-inch AC overlay; 1.5-inch full-width grind and overlay; 5-foot wide tapered grind (0.00-0.12’-depth) and 0.12’ full-width overlay; crack seal; application of Type I conventional slurry; adjustment of exiting manholes to grade; adjustment of water valve can covers; and restoration of striping, pavement markings, and legends. frama@chinohills.org engineering@chinohills.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT