CSS Pipe Rehab Under I 5
BID DATE
03/17/21 - 2:00
AGENCY
Sacramento
ESTIMATE
n/a
SCOPE
These Special Provisions cover, in general, the rehabilitation of the combined sewer facilities located between MH125EE13 (intersection of 3rd Street and U Street) and MH108EE13 (U Street cul-de-sac, east of Front Street). The work to be performed consists of: 1. Rehabilitating approximately 542 linear feet of the existing 84-inch combined sewer pipeline using cured-in-place pipe (CIPP). 2. Removing and replacing MH108EE13 in order to install the CIPP. 3. Rehabilitating MH125EE13 and MH127EE13 using epoxy lining. 4. Bypass and traffic control as needed to complete the rehabilitation work. https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/80115 James Yorita 916-808-1911 JYorita@cityofsacramento.org