Access the Full Project by Clicking here!
Bidjugde
JOB
North 16th St Water Main Interconnects Abandonment
BID DATE
03/17/21 - 2:00
AGENCY
Sacramento
ESTIMATE
$268,000
SCOPE
The scope of work for the project within the package includes transmission main abandonment and distribution main installation, as shown and described in the Contract Documents. Transmission Main Abandonment: The work will consist of relocating a fire service to an existing transmission main, furnishing and installing a custom steel plate to cap a transmission main, installing a 6” Blow-Off valve, abandoning a section of transmission main by filling it with blown sand or a slurry mixture, and other associated work as shown on the plans or described within these Special Provisions. Distribution Main Interconnects: The work will consist of removing existing blow off valves and placing 8” water main, connecting existing mains to where those blow off valves once were, installing a fire hydrant, installing 2” blow-off valves, and other associated work as shown on the plans or described within these Special Provisions. The hot taps will be performed by City Of Sacramento staff. https://pbsystem.planetbids.com/portal/15300/bo/bo-detail/80104 Bradley Howard 916-808-8889 BHoward@cityofsacramento.org
PREBID
3/4/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT