Access the Full Project by Clicking here!
Bidjugde
JOB
Ballinger 2nd Street Waterline Replacement
BID DATE
03/12/21 - 11:30
AGENCY
Ballinger
ESTIMATE
n/a
SCOPE
1. Base Bid installation of 1,534 linear feet (LF) of 6” DIPS DR-11 HDPE water line via open cut trenching, gate valves, reconnects, and all related appurtenances. 2. Additive Alternate A installation of 381 linear feet (LF) of 6” DIPS DR-11 HDPE water line via open cut trenching, gate valves, reconnects, and all related appurtenances. https://www.civcastusa.com/project/602ee29a3b1baace66d21898/summary sage.diller@e-ht.com
UPDATES