Parkland Village Lift Station No 7
BID DATE
03/3/21 - 2:00
AGENCY
Harris County Municipal Utility District
ESTIMATE
n/a
SCOPE
The lift station has been designed to be constructed with a 8-foot diameter concrete wet well at a depth of 25 feet below natural ground (by caisson construction), with a 12-inch diameter influent line at a 20-foot depth, two (2) submersible lift pumps with a firm capacity of 244 gallons per minute (gpm), a 6-inch force main, elevation controls, auto dialer, a manual power transfer switch, a pad mounted transformer, and connection for a portable emergency generator. A 6-inch diameter passive ventilation pipe will also be utilized. The facility will be encompassed by an 8-foot tall security fence. Contractor will be responsible for obtaining, installing, and constructing all materials per plans and specifications to provide a fully functional and operational sanitary lift station. https://www.civcastusa.com/project/6025b4f671a7a868bd220dd7/summary npratka@costelloinc.com
PREBID
2/24/2021 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT