Access the Full Project by Clicking here!
Bidjugde
JOB
Saratoga Springs Northgate Water Lines
BID DATE
03/9/21 - 3:00
AGENCY
Saratoga Springs
ESTIMATE
n/a
SCOPE
The construction of approximately 250 ft of mostly 12” HDPE drinking water pipeline and 290 ft of mostly 12” HDPE secondary water pipeline, and the trenchless installation of approximately 140 ft of 48” steel casing with 3 internal HDPE casing pipes. Construction includes associated piping, fittings, valves, casing spacers, casing pipes, seals, appurtenances, pipeline testing and disinfection, existing pipeline removals, and tie-ins to existing pipelines. This project will be constructed to the City of Saratoga Springs standards and will be incorporated into the City’s drinking water and pressurized irrigation systems. https://solutions.sciquest.com/apps/Router/SourcingResponseSummary?EventId=954448&SupplierId=17322236&OrgName=50031095&tmstmp=1613924031087 Jeremy Lapin +801 (766) 6506 ext.171 jlapin@saratogaspringscity.com
PREBID
3/2/2021 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT