Redwood Road Sidewalk 1100 North
BID DATE
03/9/21 - 2:00
AGENCY
North Salt Lake
ESTIMATE
n/a
SCOPE
The work to be performed consists of furnishing all labor, tools, materials, equipment, transportation, and services required for the construction of the above described project as included in the Contract Documents; consisting of the following items of work: The installation of approximately 1,056 LF of six foot wide asphalt sidewalk, including removal of existing landscaping and excavation of sidewalk path; all in accordance with the Drawings and Specifications prepared by the North Salt Lake City Engineering Department. gary.kobzeff@nslcity.org