FWRC Secondary Treatment Expansion Preloading
BID DATE
04/1/21 - 3:00
AGENCY
Clark County Water Reclamation
ESTIMATE
$11,700,000
SCOPE
The Work includes rerouting an electrical ductbank approximately 750 feet in length. Construction of an earthen embankment utilizing approximately 300,000 cubic yards of soil from two separate borrow sites located at the Flamingo Water Reclamation Center The soil is to remain in place and the site is to be monitored for approximately 12 months. Once consolidation is sufficient, the soil will be moved back to the borrow pits and the borrow pits will be restored. lsilver@cleanwaterteam.com