Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Improvements West SH 332 2010 Bond Yaupon Ditch Lining SH 332 Walnut Street Crossing Repla
BID DATE
03/3/21 - 2:00
AGENCY
Lake Jackson
ESTIMATE
$800,000
SCOPE
The work is further described as remove existing multiple concrete pipe culvert, structure headwalls, street pavements / walks, and downstream ditch lining transition to include water line crossing and replacing with reinforced concrete multi box culvert with headwalls / railings and ditch lining transitions. https://www.civcastusa.com/project/601c677de8c507fc4a7ceac4/summary mepps@lakejacksontx.gov
UPDATES