Millville Sewer
BID DATE
03/5/21 - 2:30
AGENCY
Millville
ESTIMATE
n/a
SCOPE
The Project includes the construction of approximately 85,000 feet of gravity sewer collection mains, a 1-million-gallon per day lift station at a depth of roughly 35 ft, 27,000 feet pressurized/gravity transmission mains from Millville to Hyrum, the connection to the existing sanitary sewer system, the abandonment of approximately 670 septic tanks, and the construction of approximately 670 sewer laterals from the homes to the sewer mains. This project includes crossing the Blacksmith Fork River and trenches ranging from 8 feet to over 20 feet in soils ranging from clay-silts to cobbles without fines. www.fransoncivil.com/project-bidding