Access the Full Project by Clicking here!
Bidjugde
JOB
Pipeline Rehabilitation BA 1
BID DATE
03/9/21 - 2:00
AGENCY
San Diego
ESTIMATE
$3,650,000
SCOPE
Construction of Pipeline Rehabilitation BA-1 consists of trenchless rehabilitation of 28,088 linear feet (5.32 miles) of existing 8-inch, 10-inch, and 12-inch diameter vitrified clay sewer mains and 14 segments of existing 8-inch diameter vitrified clay sewer main will include point repairs. Work will include the installation of new sewer manholes, new sewer cleanouts, manhole repairs, rehabilitation of existing sewer manholes, rehabilitation of sewer laterals, and all appurtenances in accordance with these specifications. In addition, all existing laterals will be rehabilitated from the property line to the sewer mains and assessed by CCTV. Scope includes preparation of D-sized engineered traffic control plans by a registered engineer. All required approval and associated permits for traffic control is the responsibility of the contractor. Celina Suarez - 619-533-6678 csuarez@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT