Access the Full Project by Clicking here!
Bidjugde
JOB
Berkeley Marina Roadway Improvements Project University Ave Marina Blvd Spinnaker Way
BID DATE
03/11/21 - 2:00
AGENCY
Berkeley
ESTIMATE
$6,250,000
SCOPE
Schedule A – University Avenue Lane Reconfiguration Clearing, grubbing, tree protection and root pruning, traffic control, adjustment of valve boxes and utility boxes, frames, and covers, adjustement of City Survey Monument, protection of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete vertical curb, rolled curb, concrete curbs and gutters, concrete roundabout, truck apron, concrete bus pad, concrete sidewalk and median, curb ramps, concrete pedestrian passageway, roadside drainage outfalls, storm drain system, bioretention concrete wall, rubblize concrete pavement, microcracking, pavement milling, removal and disposal of concrete pier caps, removal and disposal of pavement surfaces and base materials, street lighting system, rectangular rapid flashing beacon system, softscape and planting, irrigation system, landscape maintenance, subgrade preparation and compaction, aggregate base course, hot-mix asphalt (HMA) paving, Full Depth Reclamation (FDR) and pavement markings, striping, and markers as specified. jespinoza@cityofberkeley.info
UPDATES