Access the Full Project by Clicking here!
Bidjugde
JOB
SR 60 Moreno Beach Drive Interchange Improvements Phase 2
BID DATE
03/12/21 - 5:00
AGENCY
Moreno Valley
ESTIMATE
$21,000,000
SCOPE
Work consists of the following: (1) reconstruction and realignment of westbound ramps; (2) addition of westbound direct on-ramp; (3) construction of new westbound auxiliary lane, (4) installation of signal at the intersection of the westbound ramp and Moreno Beach; (5) addition of ramp metering, (6) demolition of existing SR-60/Moreno Beach overcrossing structure; (7) replacement of SR-60/Moreno Beach overcrossing structure including raising roadway profile and adjusting eastbound ramps, traffic signals, and Moreno Beach to grade, (8) utility relocations and installations in the bridge, (9) provision for highway planting, irrigation, hardscape, and erosion control for the entire interchange, (10) accommodation of off-site drainage called Line K-1 (along Ironwood Avenue 1/2 mile north of the interchange); (11) addition of bike lanes and sidewalks on Moreno Beach; (12) electrical facilities construction; and (13) related work. Utility coordination with Moreno Valley Utility (MVU), Frontier Communications, Southern California Edison (SCE), and Eastern Municipal Water District (EMWD) is required. Capital Projects Division - 951-413-3130 techinfo-capproj@moval.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT