Access the Full Project by Clicking here!
Bidjugde
JOB
Recycled Water Distribution Pump Station Upgrades
BID DATE
03/11/21 - 3:00
AGENCY
Santa Barbara
ESTIMATE
$1,600,000
SCOPE
Upgrades to the Recycled Water Distribution Pump Station including, but not limited to, replacement of five vertical turbine pumps with new pumps, and motors; electrical equipment including motor controls, variable speed drives, motor control center, conduit and wire; new chlorine residual analyzers; piping and accessories; replacement of a flow meter, installation of a new pressure transmitter; and associated demolition work. Tom Evans 805-560-7544 tevans@santabarbaraca.gov
UPDATES