JOB
Lift Station Discharge Piping Repairs
BID DATE
02/25/21 - 2:00
AGENCY
Paso Robles
ESTIMATE
n/a
SCOPE
The work shall include but is not limited to, demolition and removal of discharge piping within wet wells at Lift Stations #3, 7, 8, 11, and 13 are scheduled to be replaced as part of the project. The extent of the replacement shall be from the discharge flange of the submersible pumps to a transition point located at the first valve within the valvle vault. At the transition point newly installed stainless-stell pipe will meet the existing valve with a flange insulation kit for dissimilar metals. Pump station bypass connections are included downstream of the valve vault. Bypass pumping for the lift stations shall be performed by the Contractor, all as shown on the plans and/or as specified herein. ditas@prcity.com