Access the Full Project by Clicking here!
Bidjugde
JOB
Asphalt Resurfacing Group 1902
BID DATE
02/24/21 - 2:00
AGENCY
San Diego
ESTIMATE
$2,700,000
SCOPE
Work will involve furnishing all labor, materials, equipment, services, quality assurance and construction including but not limited to grinding, cold milling, hauling and disposal of the existing asphalt and concrete and installment of new pavement, excavation for pavement base repair, raising appurtenances and survey monuments to grade, reconstruction survey monument box, sweeping, installation of curb ramps to meet ADA requirements, curb and gutter removal and replacement, sidewalk panel removal and replacement, cross gutter and alley apron removal and replacement, residential and commercial driveway replacement, curb outlet – type A placement, relocation of pedestrian push buttons, placement of pedestrian barricades, tree trimming, root pruning, tree root relocation and pneumatic soil excavation, installment of root barriers, tree removal, weed abatement, weed spraying, replacing traffic striping/markings/markers/devices, replacing vehicle detector loops and stubs, traffic control drawings and permits, storm drain inlet protection, and installation of inlet markers for various streets throughout the City. Celina Suarez - 619-533-6678 csuarez@sandiego.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT