Access the Full Project by Clicking here!
Bidjugde
JOB
Lifecycle Curb Gutter Replacement
BID DATE
02/24/21 - 2:00
AGENCY
Corpus Christi
ESTIMATE
n/a
SCOPE
The project scope consists of removing and replacing approximately 6,500 linear feet of rolled concrete curb and gutter, 6,000 square feet of driveway approaches adjacent to the new curb and gutter, 1,600 square feet of sidewalk only as may be required to ensure proper slopes of the new driveways, 2,800 square yards of asphalt repair (3 feet wide) along the new curb and gutter resulting from the excavation for the removal of the existing curb and gutter and 800 square feet of ADA curb ramps only when curb and gutter is removed at the radius of a street corner. The first delivery order will be issued at the preconstruction meeting together with the notice to proceed with the construction work. Additional delivery orders will be issued so as to prevent any standby time by the Contractor. Refer to contract documents, plans and specifications for additional information. https://www.civcastusa.com/project/6009f8a11eb879c0482140a4/summary LoisH@cctexas.com
PREBID
2/3/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT