Harvest Ridge Section One Streets Drainage Water Wastewater Improvements
BID DATE
03/2/21 - 11:00
AGENCY
Brohn Homes
ESTIMATE
n/a
SCOPE
The work shall consist of the following: Drainage Infrastructure Including Approximately 18”-36” HDPE Pipe, Headwalls and Appurtenances; Water Piping Including 8”-12” PVC Mains and Appurtenances; Gravity Wastewater Piping consisting of 8”-12” PVC Pipe and Appurtenances; Excavation, Embankment, and Paving; Sedimentation & Erosion Control; Water Quality Improvements Including a Detention Pond, Drainage Channels; and Various Other Subdivision Improvements. https://www.civcastusa.com/project/600c1e78df2a1b7058595d66/summary charris@bgeinc.com