Access the Full Project by Clicking here!
Bidjugde
JOB
Highway 84 Corridor Wastewater System Improvements Phase 2
BID DATE
03/2/21 - 2:00
AGENCY
Waco
ESTIMATE
n/a
SCOPE
The City of Waco has issued this solicitation for Highway 84 Corridor Wastewater System Improvements Phase 2 Contract B. The project generally consists of but is not limited to all labor, materials, equipment, appurtenances and incidentals as required to properly install, complete and be accepted in place approximately 3,370 linear feet of 21-inch 115 PS PVC ASTM F-679 gravity wastewater line, 10 new 6- foot diameter concrete manholes, approximately 710 linear feet of bore and encased line using 24-inch & 36-inch steel casing pipe, approximately 11,600 linear feet of 16-inch HDPE or Fusible PVC wastewater force main, and the removal of approximately 7,050 linear feet of existing 6-inch wastewater force main. Victorv@wacotx.gov
PREBID
2/9/2021 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT