Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Elliot District Park (Big League Dreams) Safety Repairs
BID DATE
06/4/14 - 4:00
AGENCY
Gilbert
ESTIMATE
$525,000
SCOPE
GILBERT intends to complete the repair work necessary to correct construction and design deficiencies at the Elliot District Park (Big League Dreams), identified as Capital Improvement Program (CIP) No. PR020 which provided for the design and construction of the Elliot District Park Baseball Complex between 2006 and 2007. The scope of work includes: 1. Correcting ADA deficiencies at two ramps and one stair in the clubhouse buildings. 2. Extending the height of the shade structure at the Tot Lot bay adding an eight foot length column to ach of the five existing columns. 3. Providing ADA compliant stairs and handrails at sixteen center aisle locations at the stadium seating and providing ADA compliant stairs at sixteen side aisle locations. This involves removing and replacing all intermitted stadium stairs. Seating will be provided and installed by Norcon Industries, Inc. (Stadium seating is not park of this contract). All stadium work will be coordinate with Norcon so that stadium closures are minimized. 4. Infilling eight existing depressed stairways for ADA compliance around the perimeter of the clubhouse buildings. All stadium work will be coordinate with Norcon so that stadium closures are minimized. 5. Providing ADA compliant stairs and handrails at sixteen dugouts and stairways that are not ADA compliant. This involves removing and replacing all intermediate stairs. All stadium work will be coordinate with Norcon so that stadium closures are minimized. 6. Correcting the slope of the walking surfaces of four switchback ramps that are not ADA compliant. lee.brush@gilbertaz.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT