Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Improvements Expansion Well No 6
BID DATE
06/8/21 - 10:00
AGENCY
Tempe
ESTIMATE
$8,000,000
SCOPE
This project will provide for the drilling, development, equipping and construction of an expanded and upgraded municipal production well facility; referred to as Tempe Well #6. The project will add new groundwater production and recovery well capacity to the Tempe municipal water distribution system for back-up water production, supplement drought supply, water quality blending and emergency preparedness. The project will also include converting the existing well head to a recharge well. Tempe Well No. 6 is located at 1411 East McKellips Road. Water pumped from the well will be used to supplement potable customers throughout Tempe. Major components of the Project will include: ï‚· Well with sounding tube ï‚· Monitor well(s) ï‚· Pump, column pipe/tube assembly, and motor for the wells ï‚· Piping from the existing distribution line to recharge well ï‚· Water flush lubrication system ï‚· Pump and motor for the recovery well ï‚· Ancillary equipment related to well controls Instrumentation and connections to Supervisory Control and Data Acquisition (SCADA) system for a fully automated well ï‚· Electrical power for all new equipment ï‚· De-chlorination system and piping ï‚· Piping to existing raw water pipeline to water plant ï‚· A 10' -6" security fence constructed of concrete ï‚· Masonry unit block and high security steel picket fencing along with access gates and lighting ï‚· A block building which will house an electrical room ï‚· The site will also be graded to provide for onsite storm water retention wendy_springborn@tempe.gov
UPDATES