Access the Full Project by Clicking here!
Bidjugde
JOB
Long Beach Boulevard Water Service Lateral Replacement
BID DATE
02/22/21 - 11:00
AGENCY
South Gate
ESTIMATE
$1,300,000
SCOPE
The work consists of reconstructing the water meter services to replace existing plastic service lines with copper piping, replacing dry barrel fire hydrants with wet barrel hydrants, abandoning existing service laterals, valves, and fittings, relocating fire hydrants, and replacing valves. Also, include abandoning the existing 4-inch cast iron main in Independence Avenue. The construction limits are in the City of South Gate: in Long Beach Boulevard from Tweedy Boulevard to Santa Ana Street, and in Independence Avenue, from Long Beach Boulevard to Victoria Avenue. All work shall be done per the Plans and Specification. Chris Castillo 323-563-5779 ccastillo@sogate.org
PREBID
1/20/2021 9:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT