JOB
Tintown Streets Drainage Tin Town
BID DATE
03/1/21 - 3:00 LIVE!
AGENCY
Bisbee
ESTIMATE
n/a
SCOPE
The Tintown Phase 3 streets and drainage project includes reconstruction of roads with an inverted crown to improve drainage, erosion control, and manhole adjustments. The streets portion will include removal of existing chip seal roads where applicable, subgrade preparation and approximately 8,025 square feet of new road surfacing with curb and valley gutters. There will also be an installation of a drainage channel at the southern drainage outlet with channel excavation, 60 cubic yards of gabion and 70 cubic yards of riprap. https://teams.microsoft.com/l/meetup-join/19%3ameeting_ZjkzYmUxZWYtODMxYi00NDFiLWJmNDQtMzhhZWY Alonzo.martinez@soudermiller.com